Sai Life Sciences won the prestigious 21st National Award for Excellence in Energy Management 2020 hosted by CII – Sohrabji […]
Sai’s new production block now open for business!
26 Jun 2019
The brand-new API and Intermediate manufacturing facility (Block #8) at Sai Life Sciences is the company’s largest block in terms of volume and size. It marks a 70% increase in reactor volume taking the combined capacity past 400 KL. The project was completed in an accelerated time-frame of 15 months and had the distinction of clocking 0.5 million manhours of project execution without a single lost time incident!
In addition to the increased volumetric capacity, Block #8 provides the flexibility to handle low and high volumes in a single block with 32 reactors (16 production trains) of sizes ranging from 1 KL to 10 KL. It has next generation automation, advanced containment systems, a separate storage area for staging of raw material and intermediates, an increased ratio of filter dryers to reactors ratio, a dedicated vacuum system for every two reactors, and a 5 KL cryo reactor.
Related News
Sai Life Sciences today announced its induction to the ACS Green Chemistry Institute Pharmaceutical Roundtable (ACS-GCIPR) as an ‘Associate Member’. […]
26 Aug 2020
• Completes first phase in committed investment of US$ 150M (> INR 1000 Cr) • Sri KT Rama Rao, Hon’ble […]